Work through these checks with one pilot device before a wider rollout. For a Cloud workspace, mark the SQL and server-service checks as not applicable; do not install SQL on an endpoint for this checklist.
Record each check as Passed, Needs attention or Not applicable in your rollout notes, together with the test time and outcome. These cards describe expected results; they do not run tests or read your server status.
When is the pilot ready?
Every applicable check has an observed successful result, and the reviewer can explain which device and period the report covers. If a check fails, keep its exact error and time, follow the linked guide, then repeat that check after resolving the cause. A successful installer screen alone is not enough.